With metal and shingle roofing complete, the cross was placed atop the cupola by Lighthouse Roofing (who said it was honor to do so). Window installation is underway and the mechanical and electrical rough-in is almost finished. The final door frames are placed and the sheetrock crew is hanging, taping & mudding. It’s all hands on deck to finish and begin work on the ceiling grid, lights and AC diffusers in preparation for the next big inspection – ceiling & coverup. We’ve debated and decided on a details for HVAC, carpet, paint, the awesome pocket doors between the fellowship hall and sanctuary and (the dreaded) attic access. Pastor David continues work on the stained glass and millwork for the altar area. It’s been a LONG ride, but beauty and function are coming together as we planned and prayed — This is the HOME STRETCH!
Upcoming Events
June 2026
Jun 08 2026
2p Service at Avante Chapel
Jun 09 2026
Tuesday Men’s Breakfast Bible Study – IHOP
Jun 09 2026
9:30a Intercessory Prayer Time
Jun 09 2026
Trail Life & American Heritage Girls Troop
Jun 15 2026
2p Service at Avante Chapel
Jun 16 2026
Tuesday Men’s Breakfast Bible Study – IHOP
Jun 16 2026
9:30a Intercessory Prayer Time
Jun 16 2026
Trail Life & American Heritage Girls Troop
Jun 22 2026
2p Service at Avante Chapel
Jun 23 2026
Tuesday Men’s Breakfast Bible Study – IHOP
Jun 23 2026
9:30a Intercessory Prayer Time
Jun 23 2026
Trail Life & American Heritage Girls Troop
No event found!
Load More




